 |
Installation
Thread strap through clean-out "Y".
Apply bowl wax to the rim of the Rip
Plug.
Push the Rip Plug into place.
3a) For better leverage when removing Rip Plug, a tab/ S-hook
should be placed on the bottom.
Thread Strap & Handle through stand
pipe.
Glue stand pipe to clean out
"Y"
Coil extra strap into a loop.
Push Strap & Handle down pipe. Then screw on the lid.
This will ensure that the strap is not pulled before the
technician is ready.
|
|
 |
Removal
Remove pipe cap, reach in pipe and grab Strap-handle. Slip
hand through handle and grip handle.
Take up slack.
Pull firmly in a continuous motion, to remove the plug.
|
Back Home
Table of content |